Skip Ribbon Commands
Skip to main content
SharePoint

Haifa’s "Carmel" terminal – The IPC completed the project during 2009. The NIS 1 billion project included the construction of a 700 meter container terminal with waterside depth of 15.5 meters. The new terminal is equipped with six super Post-Panamax cranes and 12 rail mounted container stacking cranes.
A state-of-the-art gate will feature advanced technology that will allow for automatic identification of cargoes, vehicles and drivers.

 

Hacarmel.png

Photographers:Cronos